Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1297

Add option at the top of the Document to added different Headers to search on.

We would like to see the option (hotdog Button) to add additional headers to the top of the Documents table to search on.
David Dudek Jr. over 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Add deselect option in resource assignment dialog when objects are already assigned to another resource

Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
about 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Enable deleting Work packages created on Control

Please enable deleting Work Packages created on Control. Our user needs to delete packages she created on her Control project. This funtion does not exist, as we were informed by Synchro tech support.
Daria Kosmala over 2 years ago in SYNCHRO Control / Forms 0 Will not implement

Ability to schedule export data to excel

No description provided
Balvit Singh over 2 years ago in SYNCHRO Control 0

Dropdown menu with suggestions when scripting

When writing/typing a script, there is only one suggestion displayed when entering the first letter(s). When entering the first letter(s), there should be a dropdown menu with multiple/all suggestions. This way scripting will be a lot easier.
over 5 years ago in SYNCHRO 4D Pro 2 Future consideration

Project Risk Management could be part of the Issues module by adding a Risk entry to the Form.

Project Risk manages 'Risk' to the Project (Schedule), not Safety. Risks found and registered with possible impact to the project schedule is used to plan and mitigate the issue. Data can then be further used to raise ongoing lessons learned . Hap...
Guest over 5 years ago in SYNCHRO Control 0

Map based RFI and progress update

There shall be functionality for update of progress using map location along with 3D object
Ketan Gupta over 2 years ago in Field / Status update | Resources 2 Will not implement

There shall be two way mapping between 3D models and schedules. If we select any activity, the respective 3D model should be highlighted rest of the 3D objects shall be visible with least transparency.

It will be useful to analyse the intrfaces between two different disciplines
Ketan Gupta over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Show documents and forms on maps

It would be useful to be able to use the map to determine where documents and forms such as issues are located. There should be a toggle to show/hide based on categories.
Arnar Agustsson over 5 years ago in Field / Forms | Maps 1 Planned

Summary Grid View - Sort by Attachment or Link

Would like the ability to Sort or even Filter in the Summary Grid View of a particular Form Definition if a Form Definition contains a link or an attachment
Dee User List Acosta over 2 years ago in SYNCHRO Control / Forms 0 Future consideration