Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1302

Custom Email Distribution list

Enable custom email distribution to engage other users with a form. It is difficult for the form originator to forward an item to their cross shift to follow up on. Enabling a distribution / linking for the form requests would enable us to better ...
Guest over 2 years ago in SYNCHRO Control / Forms 0 Already exists

Ability see tasks related resources in Field app

User should be able to visualize task related resources.
Manoj Jamma over 2 years ago in Field / Status update | Tasks 2 Will not implement

Copy/paste tasks between open SP files

currently you can use copy as text/paste as text to copy tasks between 2 separate SP files improvement is to allow users to Copy Task/Paste Task (and all of it's properties) between 2 open SP files
about 5 years ago in SYNCHRO 4D Pro 0 Already exists

Add option at the top of the Document to added different Headers to search on.

We would like to see the option (hotdog Button) to add additional headers to the top of the Documents table to search on.
David Dudek Jr. over 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Enable deleting Work packages created on Control

Please enable deleting Work Packages created on Control. Our user needs to delete packages she created on her Control project. This funtion does not exist, as we were informed by Synchro tech support.
Daria Kosmala over 2 years ago in SYNCHRO Control / Forms 0 Will not implement

take measurements and calculate areas while performing an inspecting

as an inspector I use a Wheel measurement device to measure distances and calculate area. I want to be able to use an enhanced GPS device to record these points and display on a map. I should be able to measure along a line (2Pts) measure multiple...
Bill McNamara about 5 years ago in SYNCHRO Control / Maps 0 Future consideration

Add deselect option in resource assignment dialog when objects are already assigned to another resource

Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
about 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Ability to schedule export data to excel

No description provided
Balvit Singh over 2 years ago in SYNCHRO Control 0

Dropdown menu with suggestions when scripting

When writing/typing a script, there is only one suggestion displayed when entering the first letter(s). When entering the first letter(s), there should be a dropdown menu with multiple/all suggestions. This way scripting will be a lot easier.
over 5 years ago in SYNCHRO 4D Pro 2 Future consideration

Map based RFI and progress update

There shall be functionality for update of progress using map location along with 3D object
Ketan Gupta over 2 years ago in Field / Status update | Resources 2 Will not implement