Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1342 of 1342

Change the Weather in Project Control

we would like to the option to switch between Fahrenheit and Celsius
Guest over 2 years ago in SYNCHRO Control / Reports 4 Already exists

Consistent user experience for searching and filter in My Work vs Form table

I like the all-encompassing search and filter options in the Form lists, which are not available in My Work. 
Arpit Prakash over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Allow custom shapes under 'Create 3D'

Allow more free design of shapes other than box, sphere and cylinder
Guest over 4 years ago in SYNCHRO 4D Pro 0 Already exists

Auto hide select elements tool bar on the top

The Select Elements tool bar should stay minimized if user has chosen to minimize it. It currently will not stay minimized even after user has minimized it, and it always blocks a portion of the model all the time, therefore user needs to constant...
Jacqueline Chen over 4 years ago in SYNCHRO Control / Models 0 Planned

Add indicator if form has a missing or corrupt attachment

No description provided
Sarah Albee over 2 years ago in SYNCHRO Control 0 Planned

RFQ (Request for Quotation) Option

RFQ in 3M - Model based QTY into Auto Draft mail should be generate and list sub-contractors' details are listing for reference & reviews. This option is very useful to Quantity Surveying and more time saving.
Guest over 2 years ago in Contracts 1

Related Form Traceability

My work history has always taught me that the 'Tag' (unique equipment identifier) was king, by that I mean everything raised (form) during the project life cycle always had a relationship to the tag, this way, moving the tag from engineering throu...
Guest almost 5 years ago in SYNCHRO Control / Forms 0 Future consideration

Wider view upon new form creation

Wider view upon new form creation as the current only covers one third of the screen width.
Kimberly Nazareth Angeles over 2 years ago in SYNCHRO Control / Forms 0 Planned

Details of which Model the Form is assigned to

If I am on a particular model and I click on a Form under Task, it zooms into the location. However, if the Form is assigned to another model that's not active, it doesn't do anything. I have no idea which model that Form could be attached to. Ide...
Arpit Prakash almost 5 years ago in SYNCHRO Control / Models 0 Future consideration

Webpage Refresh deaults to Map View

When I refresh the webpage, regardless of the model I am working with, the view defaults to the Map view. Before Refresh - After Refresh - It might be better to maintain the same model view that's currently active, considering there could be diffe...
Arpit Prakash almost 5 years ago in SYNCHRO Control 0 Future consideration