Playing the simulation under the Schedule tab, even with Day and Slow Speed options selected, is too fast for projects that are being tracked on an hourly basis (eg emergency train outage, Shutdown / Turnaround) The same goes for reviewing simulat...
Place QR Code on selection set of sheets at one time
We need to have the ability to place a QR code on multiple sheets in a single action as moving it from the current default location on hundreds of individual sheets takes hours to perform and is not efficient.
Have a way to quickly view which published PDFs do not have a QR code.
It would be useful to implement some way to identify which published sheets need to have a QR Code placed. Possibly implement a red flag tag action of sheets that have no QR code. Essentially we need a quick and easy way to identify which publishe...
For certain workflows there is a need to have dates required as a part of a transition as opposed to in a status. As an example, there Desired workflow for an Inspection Request: Planning User fills inspection details All mandatory fields can be s...
Allow user to save appearance profile in the auto-matching rule
We should be able to select the “Appearance profile” at Rule level and store it with the Rule. You could keep the one on the window “Auto Matching (Resources to Tasks)” just in case someone needs to override, but this field should be governed by t...
Add ability for a control to be set as required/not required based on condition/script
Case scenario where an inspection is carried out with either a pass or fail outcome. If failed outcome a script will reveal Comments box that needs to be filled with the reason of failure. We need to make this box mandatory IF inspection outcome i...
Re-assign form to other user without change / fill any data in the form
We cannot re-assign the form to other user as there is mandatory field empty. What we want is to able to re-assign form to other user without change / fill any data in the form. The use case is if we send the form to wrong person, and that person ...
Currently we do not have the capability to place a QR code on multiple sheets at one time. It would be useful when doing QC on published sheets if a QR code has been placed in the thumb nail view without clicking on the panel icon.
Add ability to select a control to be hidden in the design manager similar to Required or Read Only
Often when doing scripts a number box is used as a counter to switch between 1, 2, 3 or other value that can be used in the script to perform conditional actions. It would be beneficial to have a property that can mark the control to be hidden whe...
Quite often we design binary actions where we need to create two different scripts to achieve a If..Else structure. Please, add option for If..Else construct. Case: Currently: Trigger: Binding "ChangeA" Condition: if binding "ChangeA" is True Type...