Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 510

Revision Control Upgrade

No bulk importing revision control, this means the import spreadsheet (revisions) will be held outside of the product. Would like to have some type of revision control inside the SYNCHRO web page
John Todd over 1 year ago in SYNCHRO Control / Inspection 0 Future consideration

move the card to header bar and shrink to save space for more important info

hello - refer to the screenshot.
Shaohua Guan over 1 year ago in SYNCHRO Control / Admin 0 Future consideration

Display Form's Creation Date and Closure Date in the form summary page

Users are currently relying on the audit trail to know when the form was created and approved/closed. Unfortunately, these details cannot be print out in the report. Having this function will help user to easily identify when the form was created ...
Siti Nurhazirah Mokmin over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Equipment library in Synchro control Document

In order to make import of 3D equipments and some basic geometry possible in synchro control project, why don't we add a equipment library by default to documents tab. This will enable user to add required equipment files to itwin bridge seamlessl...
Guest over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Description Field for Form

I feel that we need a description field for a form. Right now we only have form Name. With form description field, we able to give more information / remarks - like what is the purpose for that form and other notes.
Indrawan Wijaya over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Update Resource Statuses within Control

SYNCHRO OpenViewer can do that and 4D Review/Control is meant to eventually displace that, so makes sense to incorporate this feature. We need to be able to Resource Status directly from within an Inspection/Form iModel attachment. The use case be...
Arpit Prakash over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 3 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 3 years ago in SYNCHRO Control / Reports 0 Future consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Layouts and speed

Hi, Would be great when alternating Layouts the speed would also change. Perhaps make it optional to store or not the speed…
Guest over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration