Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1343

PDF geolocation by level for building

When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Luc Poulin over 1 year ago in SYNCHRO Control / Plan Sets 0

matrix of assigned users to forms in a project or group of projects

When onboarding and specifically when removing people from forms it would be useful to have the ability to export/download a matrix of users vs assigned to forms. That would help maintain visibility over which forms the user has a role in.
Kiril Tasev about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Critical Path in Visual Reports/Animations

Any chance or option to view critical path elements in the model while running the animation?
Ameya Talekar 8 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0 Already exists

KPI Pie charts, Progress figures in animation

Considering the synced schedule to be cost and resourse loaded, is there a R&D in progress or any option already available to view KPI's in the animation video without needing to buy additional package from the third party?
Ameya Talekar 8 months ago in SYNCHRO 4D Pro / Animations 0

"Categories"needs to be an advanced search and data visualization option

There is no way to save a search based on Categories (or level names). Categories (level names in dgns) have significant meaning in the models. Being able to search for a group of categories that have a descriptive word (rebar, top, abut, etc) is ...
Guest about 2 years ago in SYNCHRO Control / Models 0

Ability to undock iModel 4D Viewer and/or Task list in the Schedule module

It would be nice to use multiple monitors to review an expanded Task list on one screen, the 4d model on the other. Currently everything gets pretty cramped within one screen, and will get worse when additional columns for Tasks are made available...
Arpit Prakash about 4 years ago in SYNCHRO Control / Models 0 Future consideration

EVA graph video with a task list only showing current tasks

I wanted to show an EVA video showing the exact costs with tasks filtered only showing active tasks. At the current time using the WBS sorting there is no way to exclusively show the total project amount in the first task and the active tasks that...
Jordan Darien 8 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Enable Bulk upload of Forms to edit existing form instances.

For owner/operators, edit the form instances in the csv file for multiple forms then upload the changes into Control for tracking. Suppliers not willing or able to access forms in web portal, send data via other apps. an owner/operator would have ...
Kerry Newbanks 8 months ago in SYNCHRO Control / Forms 0 Unlikely to implement

UI improvements: Project Start/Finish date and progress

Create a UI to select a start and end date for a project when creating it, and allow project parties to see the progress of the current project on the home screen.
HoSang Jeon 8 months ago in SYNCHRO Control 0 Future consideration

Autodesk BIM360 Integration with iModel

Allow for integration/sync with Autodesk BIM360 sync with iModel, not just ProjectWise.
Connor Smith about 4 years ago in SYNCHRO Control 0 Future consideration