Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1302

Linking tasks with respect the % done

I woulld like to make a link, where the task starts at 50% done of its predecessor, as MS Project does.
Sergi Ferrater - AECon over 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Will not implement

Able to Select Component in Custom Hierarchy

When we set the 3D object / Resources as using Custom Hierarchy. When we select a Node, it does not select all component under that node. And in the right click menu there is no Select Child Object. We must manually select the child component. It ...
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

digital link between smart name badge and field app

Having a link between a smart identification badge and the field app device will go a long way to prove the inspection was completed by the person logged in and was at the specific area the inspection took place - and not in a construction cabin d...
John Todd over 4 years ago in SYNCHRO Control / Inspection 0 Future consideration

Form Escalation Summary

Is there a way to Track when a form has been escalated and the form number it was escalated to. For Example: If we escalated Transmittal form 192 to an RFI and the escalation created form #RFI-101 is there any way to quickly track the escalation l...
Derryl Acosta over 2 years ago in SYNCHRO Control / Reports 0 Future consideration

Larger File Path Display

The current file path in Documents only provides the last 2 folders. See attachment example: 01 - Plans > Volume 1 - Civil This should display the entire path: Documents > 05 - Plans - Field Documents > 01 - Plans > Volume 1 - Civil
Guest almost 5 years ago in SYNCHRO Control / Documents 1 Future consideration

Export photo drop images in report

Currently, images that are uploaded via the photo drop are not exported with the other images that are added via the attachment function (i.e. not flushed to the bottom of the report). It will be good to have all the images exported together to en...
Siti Nurhazirah Mokmin over 2 years ago in SYNCHRO Control / Photos 0 Future consideration

Change Management

The Cost Code assignment mostly is base on Component Property. And when we have the new 3D Model update, there is a chance that the property are change, and because property change, the cost code that have assigment can be wrong. We want that Mode...
Indrawan Gmail over 2 years ago in SYNCHRO Modeler 0 Needs review

Predefined Variable Mapping

We found that if we do new component assign to a cost code in new machine, we need again to do the predefined variable. It is good if Modeler can automatic use the old mapping, like if we do assignment in old machine.
Indrawan Gmail over 2 years ago in SYNCHRO Modeler 0 Needs review

Hide Component from Component Tree

Modeler should have easy way to isolate the component from Component Tree
Indrawan Gmail over 2 years ago in SYNCHRO Modeler 0 Needs review

Ability to animate cutting plane

Animate cutting plane using some 3D paths
Sagar Soni over 2 years ago in SYNCHRO 4D Pro / Animations 0 Will not implement