Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1297

See source of model and Ability to remove model from iModel viewer

Using the iModel viewer in the browser gives a list of different models. It doesn't show however where these models come from. It would be useful to see that (when hovering or in the properties ...) At the same time it would be useful to have the ...
Johan De Cock 9 months ago in SYNCHRO Control / Models 0 Future consideration

Get overview of "local" connectors from within the cloud environment

I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
Johan De Cock 9 months ago in SYNCHRO Control / Models 0

Allow GCS Reprojection

I often have models or drawings that are not created in the same (/correct) local coordinate system. In Microstation application it is possible to assign GCS to those different files and then reference them with "GCS reprojection". Meaning that th...
Johan De Cock 9 months ago in SYNCHRO Control / Models 0 Planned

Change Selection Method

Model Viewer - Provide the option for users to change their Element Selection method from cumulative (each new element selected is added to the current selection) to a single-element select where tapping a new element creates a new selection.
Ariel Froerer over 1 year ago in Field / Models | Display 1 Future Consideration

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

enable transitions in offline mode

Some activities like inspections or witness poitns rely on multiple users beign on site and carrying an inspection. If satisfactory they will sign/certify the fact and can transition the flow between each other to do that. In offline mode this is ...
Kiril Tasev over 2 years ago in Field / Forms | Inspections 0 Future Consideration

State and Status should match

In the workflow for a Form Definition, if a Form Definition State is Closed, it should also match the Status. In the Audit trail, it does not tell me as a User if a Form Definition is really Closed as Approved, Reject, or Void. It would just be in...
Derryl Acosta about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Email Notifications when Documents uploaded to the Documents Module

When Documents are uploaded to the Documents Module, it would be nice to have the option to receive email notifications when new documents or any documents are uploaded to this module.
Derryl Acosta about 3 years ago in SYNCHRO Control / Documents 0 Future consideration

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

To use thousand separators when numbers are displayed in the form

When using the number box in the form, there is no thousand separator in the number displayed. This makes it hard to see the value, especially for large amount like hundred thousands and millions. However, if use text box, this doesn't allow the m...
Siti Nurhazirah Mokmin almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration