Synchro 4D Pro Gantt and EVM configuration improvement
As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
How to determine which element of the model the task is assigned to?
By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon
over 1 year ago
in Field / Forms | Forms
0
Future Consideration
Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher
over 1 year ago
in SYNCHRO Modeler
0
Future consideration