Display Resources Tree in Synchro Control \ Schedule
To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Auto-populate secondary cascading list dropdown's when only one option is available
It would be nice to be able to remove 2 unnecessary clicks. Lists are as follows First List > Second List1 > A 1 > B 1 > C 1 > D 2 > E 3 > F 4 > G 4 > H On the First List, when selecting 2 or 3 we would like to remove th...
Caitlin Zeuli
over 3 years ago
in SYNCHRO Control / Forms
0
Future consideration
To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).
To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Combine Form 1, Form 2, and Form 3 into one comprehensive report for that day. The Contractor’s Daily Report: Foreman Daily Record Foreman 1 Foreman 2 Foreman 3 Quality Inspector Daily Record Inspector 1 Inspector 2 Inspector 3 Safety Inspector Da...