Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1310

View PDF view when creating a Custom Printout without having to create a FORM

I would like to be able to view a PDF view of a Custom Printout in Draft mode without having to Publish and then actually create an active Form.
David Dudek Jr. about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to assign grid bound data to fillable PDF for export

Users would like to see reports in the pdf form that they are used to seeing. Therefore, custom export is not preferable over fillable pdf. As of now, I think the data captured via grid can be exported into a standard or custom pdf but not a filla...
Paolomee Udani over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Fast Option - Selection Level - Include Form

hi Dev Team, Now 4D Pro can access the Form. If can add the Fast Option feature to able to select Form, I think it may give some value. Also if there is any more easy way to see the connection between Form and Task also good. Thank you, Indrawan
Indrawan Wijaya over 1 year ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Will not implement

Manage iModel connections UI in Synchro control

I would like the feature to select all imodel and change the sync schedule timing or while changing the schedule for each model the options should stick in one place when scrolling down to select the models.
Jerry David Jaypaul about 3 years ago in SYNCHRO Control 0 Future consideration

SYNCHRO Field - Summary View

Summary of Un-Synched and Synched items on the Field App Having a Summary of a Users Work Summary and a Users Own Work / Project that shows New,Overdue,Close deadline, etc.
Derryl Acosta over 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Drag n Drop revisioning in PDF plan sets

If the user could drag an uploaded sheet on top of the existing published sheet icon in the left nav bar to revision it. It would save the user from having to manually lenter the sheet # in order to initiate the revision process
Guest over 4 years ago in SYNCHRO Control 0 Future consideration

ProjectWise document connection Lower connection to Project Level

project framework then project top folders under that it would be good to be able to connect into a lower level of the folder structure so we can connect to areas specific to the control project
Alastair Barbrook over 1 year ago in SYNCHRO Control / Documents 0 Already exists

Selection when creating a profile

When "Profile" enabled from "Civi Tools", hide or show in transparent the elements that cannot be used to create a profile. Prompt message if nothing can be used in the iModel.
Shaohua Guan over 1 year ago in SYNCHRO Control / Civil Tools 0

Form template document links

Links and external documents attached to the Template form so when creating a new it has the links predetermined.
Alastair Barbrook over 1 year ago in SYNCHRO Control 0 Future consideration

multiple form workflows

check sheet fail brings up new issue and new NCR. if a function is triggered it brings up a new issue form / ncr
Alastair Barbrook over 1 year ago in SYNCHRO Control 1