Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 509

refreshing browser does not land at where I was in browser. Retain view after refresh

When looking at a schedule of instances of a list of forms (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh t...
Kiril Tasev 8 months ago in SYNCHRO Control 0 Future consideration

Autodesk BIM360 Integration with iModel

Allow for integration/sync with Autodesk BIM360 sync with iModel, not just ProjectWise.
Connor Smith over 3 years ago in SYNCHRO Control 0 Future consideration

Upload plan sets from PW and documents section

Currently the workflow requires a download from the source (PW or project documents) and an upload to plan set. That leaves up to 3 copies of the same file.
Dan Sheldon over 3 years ago in SYNCHRO Control / Documents / Plan Sets 1 Future consideration

Ability to automatically fill Plan Set fields from title block

All sheets within a plan set typically have a title block with consistent data structure and location. We can already select text from a smart pdf, or ocr capabilities for dumb pdfs. We should be able to map this information to their respective fi...
Arpit Prakash over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Automatically add Map location when adding a geolocated Model location on a Form

Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest almost 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Compare button in Schedule view

The "Compare" button in the schedule viewer needs some tooltips or explanation on what its purpose is. What is the difference between the top and bottom slider buttons? It also seems a little "clunky" when sliding. See this attached video
Thomas Whiteley over 3 years ago in [Archive] SYNCHRO 4D Review 1 Future consideration

Ability to map field to more than one PDF location

Control only allows each field to map to one spot on a PDF. There are many fields were the information needs to be mapped to different locations on the PDF - like when each pdf page has data in the header. The Forms service has no limitation.... i...
Guest over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. over 1 year ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Ability to have subproject

We need the ability to have multiple projects under one main project. I this example, see attached image. I have one main job number. And in this case 350 different airports or sub projects. Each project has the same folder structure in it. Right ...
Martin Price almost 3 years ago in SYNCHRO Control / Admin 0 Future consideration