Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1343

Filter form status in Schedule view

When managing form with multiple instances it is necessary to be able to filter out some of the statuses and work on the rest. i.e. in attached to filter out the backlog, not suitable and rejected and just leave the live instances. Either by allow...
Kiril Tasev 7 months ago in SYNCHRO Control / Forms 0

Enable Linked/related/escalated forms to be exported with the Parent

Provide ability to export linked/related/escalated forms with on of the Donor/Parent forms. E.g. Form A is related to Form A.A. Click checkbox in front of Form A and select Export to PDF. Choose all standard parameters. Provide additional toggle t...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher over 2 years ago in SYNCHRO Modeler 0 Future consideration

Cross section selection tool on other views

It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf over 2 years ago in Field / Models | Tools 0 Future Consideration

Add ability to choose your own fields to sort by in MY WORK

Please add the same ability to pick and choose your own 'view' using the project specific fields that have been filled out in the MY WORK area. ( pic 1 ) Same ability as has been give under the individual forms ( pic 2 ) This will give our contrac...
Irena Seleznjova 7 months ago in SYNCHRO Control / Forms 0

Able to do Concatenate Some Bindings to a Target Binding

User want to have the function that able to Combine value from some different binding to another single Target Binding. Example to Combine generate single Document Number from different field.
Indrawan Wijaya over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta over 4 years ago in Field / Status update | Tasks 1 Planned

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton about 1 year ago in SYNCHRO Control / APIs 0 Already exists

Project creation through the API

When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Russ Campton about 1 year ago in SYNCHRO Control / APIs 0