Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 491

[Copy] Keep "Alerts" Populated

It would be a HUGE quality of life upgrade if Alerts did not disappear when something is changed in the schedule. We work down through that list of alerts to ensure our "Schedule Log" is clean and after every "fix" it disappears. If the behavior c...
Maria Protasova 29 days ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Media Indexing - Filters on photo folders

I would like to be able to filter my photos by folder in my documents section once we are able to dump photos into folder for indexing
Beth Buerger 5 months ago in SYNCHRO Control / Media Indexing 0 Future consideration

Keep "Alerts" Populated

It would be a HUGE quality of life upgrade if Alerts did not disappear when something is changed in the schedule. We work down through that list of alerts to ensure our "Schedule Log" is clean and after every "fix" it disappears. If the behavior c...
Thomas Whiteley 5 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Attachments within Transition Button

It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes 7 months ago in SYNCHRO Control / Forms 0 Future consideration

Allow documents connections to different sources

Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Kerry Newbanks 7 months ago in SYNCHRO Control / Documents 0 Future consideration

UI improvements: Project Start/Finish date and progress

Create a UI to select a start and end date for a project when creating it, and allow project parties to see the progress of the current project on the home screen.
HoSang Jeon 8 months ago in SYNCHRO Control 0 Future consideration

Print the PDFs into a single folder

When we select multiple PDFs and print them, it creates a folder for each of these PDFs. It should print them into a single folder.
Yessica Andrade Barbosa 12 months ago in SYNCHRO Control / Forms 0 Future consideration

Add favorites on forms

Ability to favorite some forms so they can be easily prioritized in a grid view.
Manoj Jamma about 1 year ago in SYNCHRO Control 0 Future consideration

I want to update inspection form status for multiple forms at a time

As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.
Mariano Colicchio about 1 year ago in SYNCHRO Control / Inspection 0 Future consideration

allow full name of forms to be displayed when making choice from "Work" menu on the left.

Further to Case CS0187259. Currently, when user clicks on the Work menu item a list of available forms is displayed. This list is shown in static width floating window, therefore longer form names are truncated. It is imperative for the user to be...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 0 Future consideration