Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1340 of 1340

Drag windows out of the way in Manage iModel

During the process of managing an iModel there are various windows that come up. Please could you add functionality for dragging these windows to a different position? For example to another computer screen. They are currently static and it would ...
Ruth Fuller over 2 years ago in SYNCHRO Control / Models 0 Planned

All users to be able to save a private file of a Control project

When using the Synchro Workgroup Project, it was possible for all users with a Synchro licence to save a private copy of the project. This was useful as people could back up their own work and try out ideas in an offline copy. With Synchro Control...
Ruth Fuller over 2 years ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message.

I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message. The Message on the first line: “Construction.bentley.com Says” is meaningless to a message ...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Forms 2 Will not implement

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 4 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

Allow for High Res Photos to be captured in the Docket Form / Mobile App

Requested via https://envisionapp.zendesk.com/agent/tickets/6575 for QBC. Photo resolution in the docket form is significantly worse than the same photo taken within the photo and comments form
Bernhard Budiono over 2 years ago in EVM (Perform) / Dockets 1 Future Consideration

Task progressing

Allow users with proper RBAC Scheduling permissions (read/write for task actuals) to status Tasks - Set status to Started or Finished. For task status set to Started - let user input Actual start date and time, % complete For task status set to Fi...
Jacqueline Chen over 4 years ago in Field / Status update | Tasks 1 Planned

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 4 years ago in SYNCHRO Control / Reports 0 Future consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Hasham Kiani over 2 years ago in SYNCHRO Control / Plan Sets 0 Planned

Extend interoperability from version 15 to version 16

Synchro 4D Pro is currently only interoperable with ASTA Powerproject up t o version 15 of the software. The current version of ASTA Powerproject is version 16.0.02 and any users in this format are unable to import files into Synchro unless they u...
chris horsfield over 2 years ago in SYNCHRO 4D Pro / Import/Export 4 Will not implement