Include map location in PDF export

Forms export to PDF in Synchro Control does not include map location although model location is included. Form was created in Synchro Field 3.2.0.157. Attachments were ticked in export dialog.
Daria Kosmala almost 4 years ago in SYNCHRO Control / Forms 1 Future consideration

WPS to AWP Battle Board Integration

Use synchro for scheduling to link to p6 Use Csim planner to build IWP Push data to Synchro Control/Field/4D
Ryan Posnikoff almost 6 years ago in SYNCHRO Control 0 Planned

Can not Isolate more than one work areas

Have capability to isolate / focus more than one work area should be good. Right now, we only can isolate one work area.
Indrawan Gmail almost 4 years ago in SYNCHRO Modeler 0 Needs review

X-Section Saved View

When I detail (dimension) a x-section view it moves to the next station properly. When I close out of x-sections then log back in the next day I would like it to remember the dimension locations I used and apply again like a saved view.
Guest almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to assign grid bound data to fillable PDF for export

Users would like to see reports in the pdf form that they are used to seeing. Therefore, custom export is not preferable over fillable pdf. As of now, I think the data captured via grid can be exported into a standard or custom pdf but not a filla...
Paolomee Udani almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Fast Option - Selection Level - Include Form

hi Dev Team, Now 4D Pro can access the Form. If can add the Fast Option feature to able to select Form, I think it may give some value. Also if there is any more easy way to see the connection between Form and Task also good. Thank you, Indrawan
Indrawan Wijaya almost 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Will not implement

Rights to assign on users in read-only mode

Hello, We publish a synchro schedule in the Control area, to allow the project team and stakeholdersto view the project. All teammembers have read-only rights. This allows them to view the schedule but unfortunately making use of established filte...
Paul Kramer almost 4 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

ProjectWise document connection Lower connection to Project Level

project framework then project top folders under that it would be good to be able to connect into a lower level of the folder structure so we can connect to areas specific to the control project
Alastair Barbrook almost 2 years ago in SYNCHRO Control / Documents 0 Already exists

Selection when creating a profile

When "Profile" enabled from "Civi Tools", hide or show in transparent the elements that cannot be used to create a profile. Prompt message if nothing can be used in the iModel.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Civil Tools 0

Synchro plug-in for revit does not retain system family cluster

User on Bentley communities: I have found some issues with complex Revit family such as trusses. After the export through a plug-in to Synchro, the trusses are no longer available to select as one object, but they are exploded into all elements (b...
Guest almost 4 years ago in SYNCHRO 4D Pro 1 Already exists