PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1322

Ability to undo/redo on large Forms

Is there a control/binding limit after which the Form will just not function? I am getting the following warning for 650 bindings. Will still like to remove the limitation of undo/redo.
Arpit Prakash almost 2 years ago in SYNCHRO Control 0 Future consideration

Design Printout

Design printout should be undoable (once chosen, it can be changed to represent the forms updates).
Ashley Edmonds almost 2 years ago in SYNCHRO Control / Forms 2 Future consideration

Binding Previews

No description provided
Ashley Edmonds almost 2 years ago in SYNCHRO Control / Forms 2 Will not implement

Binding duplicates

When choosing a binding (that has previously be created) on a form, it should notify you that that binding is already in use on the form, and if you are happy to continue?
Ashley Edmonds almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Default text

A control needs to be added to show the default text assigned to any font on the form (showing font, etc).
Ashley Edmonds almost 2 years ago in SYNCHRO Control / Forms 0 Will not implement

Access Control to 3d model and views

feature able to create a view Eg- a steel fabrication view to be created in synchro pro and uploaded on to synchro control. and in manage role having a feature to give access to only a steel fabricator stakeholder. This will allow the subcontracto...
Romit Takle over 3 years ago in [Archive] SYNCHRO 4D Review 0

links within pdf sheets

if a plan sheet has a call out for a detail on a different sheet, can i set up a link on that sheet that will automatically take me to the detail sheet.
Brian Weihrauch almost 2 years ago in SYNCHRO Control / Plan Sets 0

Model Not Appear When we do Resource Progressing

When we do resource progressing, and if we have a Removing Activity, the component geometry is not appear. We need to set the timeline to the task date so we can see the geometric. To help user easily get the timeline for that task, it is good to ...
Indrawan Gmail over 3 years ago in Field / Status update | Resources 2 Already exists

Export 3D Filters to Synchro Contol

To be able to export the 3D filters used on a saved view to Synchro Control, so we can have saved views of specific scopes of work in the app field
Viviana Urrego almost 2 years ago in SYNCHRO Control / Models 0

Allow display of WBS code in the quantity progress page

We frequently handle multiple activities with similar names due to similar nature in the same programme (e.g. submissions and approvals of similar installations). Without WBS code it is difficult to identify which specific work package it is about.
Pak To Hui almost 2 years ago in Perform / Progress Measurement 2 Future Consideration