Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1337

Synchro Control iModel - User Field Info preferences

Upon selecting a 3D element in the iModel, some information is displayed in the side panel about it. I want the ability to display desired User Field information about the selected 3D Element: i.e., Work Package Number, System ID, Subcontract Pkg ...
Derryl Acosta over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 8 months ago in SYNCHRO Modeler 0 Needs review

Able to Edit Photo when use Camera

In Synchro Field, when we add attachment from camera, after take photo, use want to edit the Photo. Adding markup, etc2. Right now there is no Edit Photo menu. Same function available in whatapps application.
Indrawan Wijaya about 2 years ago in Field / Forms | Forms 1 Planned

Ability to map Form binding to project meta-data

This is esp. helpful when setting up a template projects and provisioning them to production. Bindings could be map to project metadata like Project Name, No. etc, and be autofilled in all Form definitions.
Arpit Prakash 11 months ago in SYNCHRO Control 0

Include 3D Filters in Excel Export/Import

Please consider adding the 3D Filters as objects that can be exported to Excel file. This improvement will allow the users to configure the 3D filters within the excel spreadsheet, and then to import them in SYNCHRO 4D Pro, reducing the time spent...
Alexandru Buzan 6 months ago in SYNCHRO 4D Pro / Import/Export 0

Keep "Alerts" Populated

It would be a HUGE quality of life upgrade if Alerts did not disappear when something is changed in the schedule. We work down through that list of alerts to ensure our "Schedule Log" is clean and after every "fix" it disappears. If the behavior c...
Thomas Whiteley 6 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Synchro 4D Pro and Primavera Open Cloud (OPC) integration

We would like to see an integration with Synchro 4D Pro and Primavera Open Cloud (OPC). The P6 integration API that is already available is only compatible with P6 and EPS, not with OPC. Instead of manually importing and synchronizing .XML files w...
Caitlin Zeuli almost 4 years ago in SYNCHRO 4D Pro 1 Future consideration

Allow for deleting multiple Work Areas at once

Manual deletion of 50+ Work Areas is such a pain.
Patryk Makowski over 1 year ago in SYNCHRO Modeler 0 Needs review

Automate the process of creating a SYNCHRO/BIC project

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control 0

Ability to upload multiple Inspection Configuration spreadsheets

Currently, we need to maintain a singular spreadsheet to add additional Form Definitions to the same project. This spreadsheet can become very large and hard to manage, and would be easier to have distinct spreadsheets for sets of similar Forms.
Arpit Prakash about 1 year ago in SYNCHRO Control / Inspection 0 Unlikely to implement