Related forms to be bound to a specific location or control in a form.
When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
Ability to disable Assign To dialog for specific workflow transitions
This is helpful in instances where the final approval will always be the one that's assigned a closed Form. A good place to disable it would be under Forms > Set workflow > Edit transition button > Advanced > Include comment on transit...
Enhancement and Customisability of SYNCHRO Notifications
This idea has two parts to it: 1) Enhancement After using SYNCHRO and deploying it for many projects, we realise the pressing need for the following to be available: Notification once a form is overdue Notification to apply to eveyone in the CC li...
Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule
Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro.
These layouts must include :
- Schedule Tasks Group and Sort,
- Schedules tasks filters,
- Relevant Schedule Tasks Attrib...
Link between documents under Documents/Connections and plant set
Since we can now display the saved search under Synchro field, it may be easier to find a document under Documents or Connections. From there if the document exist under Plan Set, a Go To link should exist to allow user to move back and forth betw...
Maintain PDF mapping after re-uploading similar pdf with updates
We should be able to maintain the mapping if the fillable fields are the same. This will save much time remapping when small updates (additions/formatting) to the PDF have to be reimported.
Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro
In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...