PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 225 of 1143

Import IFC file problem

Hi While working with IFC and SYNCHRO, I noticed a problem ... When I import the IFC4 model into the Synchro, in many cases some elements of the building are removed and I think solving this problem will improve this software.
Amirhossein Afradi over 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

To stop the imodel synchronising process

Possible to allow users to stop the synchronising process? Currently, users not able to stop the process once it is started, and not able to skip to the next model that is in the queue. Is there a way to skip the synchronizing process to the next ...
Guest over 3 years ago in SYNCHRO 4D Pro 2 Future consideration

Allow user to specify key used for mapping

When we import Excel File to SYNCHRO, It is good it can accept other data as the Mapping Key, not only the SYNCHRO Standard ID. Please check the PDF file attached in more details.
Indrawan Gmail over 1 year ago in SYNCHRO 4D Pro / Import/Export 4 Planned

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 1 year ago in SYNCHRO 4D Pro / Animations 0

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Planned

Color Mode: Task Table Column add Transparency

The color mode of Task Table Column in 3D View Properties is very useful for displaying 3D objects based on codes inputted in P6. When applying the conditional formatting to the P6 data, there is no option for transparency. Please could the functi...
Ruth Fuller 10 months ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Will not implement

Shadows and ambient occlusion check boxes issue in animation export

Using synchro 6.4 I am having export issues: When I go to export an animation it ignores the shadows and ambient occlusion check boxes and there are either permanently on or off no matter what is ticked in the boxes. This also overrides the view i...
Guest over 2 years ago in SYNCHRO 4D Pro / Animations 0 Planned

All users to be able to save a private file of a Control project

When using the Synchro Workgroup Project, it was possible for all users with a Synchro licence to save a private copy of the project. This was useful as people could back up their own work and try out ideas in an offline copy. With Synchro Control...
Ruth Fuller 11 months ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Import https://dotbim.net/ .bim file format

https://dotbim.net/
David Félix almost 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Extend interoperability from version 15 to version 16

Synchro 4D Pro is currently only interoperable with ASTA Powerproject up t o version 15 of the software. The current version of ASTA Powerproject is version 16.0.02 and any users in this format are unable to import files into Synchro unless they u...
chris horsfield 12 months ago in SYNCHRO 4D Pro / Import/Export 4 Will not implement