hi Dev Team, Now 4D Pro can access the Form. If can add the Fast Option feature to able to select Form, I think it may give some value. Also if there is any more easy way to see the connection between Form and Task also good. Thank you, Indrawan
ProjectWise document connection Lower connection to Project Level
project framework then project top folders
under that it would be good to be able to connect into a lower level of the folder structure so we can connect to areas specific to the control project
When "Profile" enabled from "Civi Tools", hide or show in transparent the elements that cannot be used to create a profile. Prompt message if nothing can be used in the iModel.
I would like the feature to select all imodel and change the sync schedule timing or while changing the schedule for each model the options should stick in one place when scrolling down to select the models.
Jerry David Jaypaul
about 3 years ago
in SYNCHRO Control
0
Future consideration
Summary of Un-Synched and Synched items on the Field App Having a Summary of a Users Work Summary and a Users Own Work / Project that shows New,Overdue,Close deadline, etc.
If the user could drag an uploaded sheet on top of the existing published sheet icon in the left nav bar to revision it. It would save the user from having to manually lenter the sheet # in order to initiate the revision process
Guest
over 4 years ago
in SYNCHRO Control
0
Future consideration
I have a few Controls under each line item, that are hidden on load, but the Section size does not truncate itself to account for that. The blank space is accommodating for all hidden Controls.
Arpit Prakash
over 1 year ago
in SYNCHRO Control
0
Future consideration