Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1303

PDF Export - Hyperlink for attachments

When exporting a PDF, it would be nice that the attachment is a hyperlink that you can click on to view the attachment.
Derryl Acosta almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Change term "Break Duration" to "Unpaid Break Durations"

The functionality of the "Break Duration", particularly in the App is to reduce the paid period and therefore should be more clearly identified as an unpaid period to avoid inclusion of paid break durations and thereby having these periods wrongly...
Ernest Downes over 1 year ago in Perform / SYNCHRO Perform Mobile 1 Future Consideration

Export to Synchro 4D plugin for Autodesk Civil 3D

Looking for Direct Synchro 4D plugin for Civil3D.
ASHWIN RAJESH K over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

User dependent "3D by selection" 3D Filters

Having individual 3D filters by selection per Control user. If you isolate or hide any 3D data in a Control project Synchro 4D Pro automatically activates the 3D Filter "3D by Selection [Administrator]". We are working simultaneously on Control pr...
Stephan Klotz almost 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Changing Assigned To using Scripts behaves differently from manual selection

I created a script to change Assigned To based on another binding. In the following, when I select A for the first time, the Assigned to changes to Arpit Test, and Send for Review transition reflects that as well - However, I get a notification th...
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Manage emails

Contractors/.CMs want to be able to link emails within their construction doc management and controls systems. This could include simple drag and drop of emails in Outlook into Bentley Project Management system to be managed as discrete doc or att...
Rich Humphrey over 5 years ago in SYNCHRO Control / Documents 0

Ability to create mapping to a fillable Form using Excel

A lot of the fields may be similarly named, and our system doesn't automatically map them. It has to be done manually, and it can become cumbersome for a large Form. Esp. because if we create a copy of the Form, the mapping does not get copied.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Issues with moving Regions

It seems the Region sometimes goes to a random location, within another Region if i try to move it around. This mostly happens if I drop it part outside the canvas. Also, doesn't look like i can move a Control below a region, but have to move the ...
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Ability to undo/redo on large Forms

Is there a control/binding limit after which the Form will just not function? I am getting the following warning for 650 bindings. Will still like to remove the limitation of undo/redo.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration

Design Printout

Design printout should be undoable (once chosen, it can be changed to represent the forms updates).
Ashley Edmonds over 1 year ago in SYNCHRO Control / Forms 2 Future consideration