PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1317

Manage emails

Contractors/.CMs want to be able to link emails within their construction doc management and controls systems. This could include simple drag and drop of emails in Outlook into Bentley Project Management system to be managed as discrete doc or att...
Rich Humphrey almost 6 years ago in SYNCHRO Control / Documents 0

Import/Export Keyframe of 3D Path

Hello Team, I know that we can copy/pas keyframe as text . This function requires to realize for each 3D path. I wonder if there is any way to export Keyframe of 3D paths to excel file and import excel file to update keyframe of 3D paths. Thanks
Quan Son Nguyen over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Make "Related Forms" accessible for Work Packages on Field

Make "Related Forms" accessible for Work Packages on Field Currently not available on apple cellphones - the related forms shown in image "Field Application 1" is not available in image "Field Application 2". please implement as soon as possible.
Shaohua Guan almost 3 years ago in SYNCHRO Control / Field/Mobile 1

Add Multiple Styles to Control in Form Design

I would like to apply different styles to control when needed, instead of building specific styles for each case. For example, I have a style for bold text and a separate style for underlined text that could be combined when needed. It would be ni...
Dillon Davis over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Label on the Right of Controls

Specifically wanted for checklists. It feels more natural to have the checkboxes align with a label on the right side. I could see use cases for other things like entering numbers for quantity or labeling dimensions.
Dillon Davis over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Turn off autosave in form designer

Sometimes I want to experiment with a form layout without worrying about clicking undo in case I don't like the changes. It would be nice to turn off the auto save or be able to revert to the state when I first opened the form.
Dillon Davis over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Ability to hide form records from Work table

Since we cannot delete forms, it would be useful to hide forms with a 'Void' status from the work table if they were submitted in error or no longer relevant. It would also be useful if those records aren't included in exported csv files.
Dillon Davis over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Keyframe List Import / Export

It would be really useful to add a feature to import and export the 3D Path Keyframe Lists for a project. This would allow the Keyframe List to be manipulated in other software, for example Excel, and imported back into the project.
Ian Bannerman over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Already exists

The ability to set the visibility duration of equipment associated to a task.

Example, a mobile crane is assigned to a 'roof cladding' task. The crane will only be required on site for the first 50% of the task to load the panels then it can removed. Having the ability/option to make the crane disappear after a certain amou...
Stephen King about 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts / Animations 0 Will not implement

Users from Synchro Control also visible in Synchro 4D Pro users

In Synchro Control you add users to your project with some the rights to schedule in Synchro Control projects with Synchro 4D Pro. When you work with different people in Synchro 4D Pro you canot see the users from Synchro Control in Synchro 4D Pro...
Martijn Querner about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration