Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1338

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 0 Future consideration

Hide Draft and Archived Inspections Forms when creating a new Inspection

No description provided
Arpit Prakash 11 months ago in SYNCHRO Control / Inspection 0

Ability to clear or update signature/timestamp

If a Form was sent back upon a Review, the Creator should be able to resign or update the timestamp, for both the Signature and Timestamp controls.
Arpit Prakash 11 months ago in SYNCHRO Control / Forms 0

Ability to embed Power BI publish to web(public) url

The current embedded solution requires authentication to view the report and makes it restricted to the creator's organization. External users cannot access this.
Arpit Prakash 2 months ago in SYNCHRO Control / Reports 0

Creating a Synchro project for Augmented Reality (AR)

Creating a Synchro project for Augmented Reality (AR) on mobile devices would be highly desirable. This would enable users to experience visualizations while being outdoors, allowing them to see virtual elements seamlessly integrated into the real...
Yasin Rafiq almost 2 years ago in SYNCHRO 4D Pro / Animations 1

Email notifications showing mis-leading information

Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Irena Seleznjova 7 months ago in SYNCHRO Control / Forms 0

Allow documents connections to different sources

Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Kerry Newbanks 7 months ago in SYNCHRO Control / Documents 0 Future consideration

Possibility to Increase the Sidebar in My Work

Because the names of some types of forms are longer, there should be an option to adjust the size of this panel.
Yessica Andrade Barbosa 11 months ago in SYNCHRO Control / Forms 0

Ability Sort Schedule by Column Date or other

For some reason when I upload my Synchro 4d project to Synchro Control the schedule does not sort by Date or by ID for some reason, so the tasks look like they are all over the place and not in order.
David McLaughlin 2 months ago in SYNCHRO Control / Schedule 0

Enhanced Synchro Field Filtering and Visualization

In the Synchro Field application, it would be beneficial to have the ability to view all forms in a specific location. This could be achieved by implementing a map separator feature, similar to the "My Work" section, but within the "More" section....
Yessica Andrade Barbosa 2 months ago in Field / Forms | Forms 0