Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 97

Dockets: allow users to have the ability to approve in bulk.

Although the Docket Inbox allows a user to approve multiple Dockets, it is limited to a single day and still requires the user to select dockets individually.
Luke Read over 1 year ago in Perform / Dockets 0 Future Consideration

Allow user to fill out form then take multiple pictures that automatically attach to form

After filling out a form in the field allow the option to take multiple photos and all those automatically attach to the form that is being worked on.
Dan Sheldon about 3 years ago in Field / Forms | Media 0 Future Consideration

Ability to link Events from Perform to P/CO

Add ability to link Event's from SYNCHRO Perform to the audit history of a Potential/Change Order. This would allow users of Cost to easily reconcile information coming in from the field.
Matthew Titmarsh over 1 year ago in Contracts / Change Order / Potential Change Order 0 Future Consideration

Pre-filled Template in Events (Mobile App)

In the Description section in Event (Mobile app) it would be great if we can have Pre-filled Template so I want the user to have a set list of details to fill in for the description for consistency.
Abhi Kotecha over 1 year ago in Perform / Events & Notices 1 Future Consideration

Manpower Productivity Report

Based on Project Schedule, allocated manpower and site field tracked Material utilization to find individual or team manpower Productively data. This data useful for further planning in similar work and find good team for productivity. Example:Own...
ASHWIN RAJESH K over 1 year ago in Perform 1 Future Consideration

Change term "Break Duration" to "Unpaid Break Durations"

The functionality of the "Break Duration", particularly in the App is to reduce the paid period and therefore should be more clearly identified as an unpaid period to avoid inclusion of paid break durations and thereby having these periods wrongly...
Ernest Downes over 1 year ago in Perform / SYNCHRO Perform Mobile 1 Future Consideration

Open linked documents in model

Many Navigator Mobile users want to open and view the linked document when selecting a specific object in the model even in SYNCHRO Field. This feature is not in the Autodesk app, and Navigator Mobile is not currently under development, so SYNCHR...
HoSang Jeon over 3 years ago in Field / Documents | Documents 0 Future Consideration

Allow display of WBS code in the quantity progress page

We frequently handle multiple activities with similar names due to similar nature in the same programme (e.g. submissions and approvals of similar installations). Without WBS code it is difficult to identify which specific work package it is about.
Pak To Hui over 1 year ago in Perform / Progress Measurement 2 Future Consideration

Include filter for start and finish dates in the activity list view

To include actual start and finish date in the filter to view activities under the framework of the WBS.
Pak To Hui almost 2 years ago in Perform / Progress Measurement 3 Future Consideration

To include percent complete at the activity list

Would it be possible to use a % complete tag to replace the fixed icon at the shortcut to progress tab?
Pak To Hui almost 2 years ago in Perform / Progress Capture 3 Future Consideration