Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1356

Select elements from multiple selected work areas - High Priority

Cannot select multiple Work Areas - HIGH PRIORITY We typically create multiple small work areas per phases by selecting polygons in the iModel. E.g. Phase 1-Step 1.1, Phase 2- Step1.2, etc. This makes it easier to adapt to work area polygon change...
Arpit Prakash 4 months ago in SYNCHRO Modeler / Work Area 2 Planned

Audit Trail Enhancement

For modification to audit trails, we want a feature to view only the changes made to it, and not the entire content of the field/binding.This would help us to understand what the exact changes made to the form is and not just the entire content of...
Guest about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to export Forms as PDF

No description provided
Arpit Prakash almost 2 years ago in Field / Forms | Forms 1 Future Consideration

Dashboards - to add customisation so that we can determine the property that the charts can be displayed

We hope to be able to customise the dashboards according to the properties and bindings that we require, as well as the ability to drill down, similar to Connect services dashboards
Guest over 4 years ago in SYNCHRO Control / Reports 1 Future consideration

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Planned

Ability to maintain folder mapping for PDF export through Forms Workflow

If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Arpit Prakash about 1 year ago in SYNCHRO Control 0

smoother and faster navigation in iModel

users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Guest about 4 years ago in SYNCHRO Control / Models 2 Already exists

Display the location of the user on the model

Enable GPS location of user on the model (the "blue dot"), based on the device location service, to allow a user to better orient themselves while on the construction site. UPD.: "As a field engineer, I want the mobile app to display my current lo...
Luke Read 9 months ago in Field / Models | Display 0 Future Consideration

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 0 Future consideration