Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1336

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Planned

Ability to manually save changes in Forms Designer

When designing large Forms, the performance heavily degrades on any action like selection, editing, etc, due to auto-save continuously running in the background. This could be a toggle to enable/disable as required.
Arpit Prakash 12 months ago in SYNCHRO Control / Forms 0

smoother and faster navigation in iModel

users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Guest almost 4 years ago in SYNCHRO Control / Models 2 Already exists

Add scheduling services to composite iModels

Add scheduling services to composite iModels to create 4D models.
Kevin Vivien about 1 year ago in SYNCHRO Control / Models 0

Add Work Area tag to elements automatically after creating Work Areas

No description provided
Johannes Yu 8 months ago in SYNCHRO Modeler 0 Needs review

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 0 Future consideration

Show multiple dates options in SYNCHRO Control

Currently SYNCHRO Control only shows planned dates, User requirement is to select all sets of dates like best dates.
Manoj Jamma 4 months ago in SYNCHRO Control / Schedule 0

Add a georeferenced image file to replace default satellite image

The default satellite images in the Forms are quite out of date. It would be good to be able to incorporate a georeferenced image file into the map to overlay or replace the existing satellite image. We collect these using UAVs at our construction...
Sheila Bjerreskov 2 months ago in SYNCHRO Control / Maps 0

Hide Draft and Archived Inspections Forms when creating a new Inspection

No description provided
Arpit Prakash 11 months ago in SYNCHRO Control / Inspection 0

Creating a Synchro project for Augmented Reality (AR)

Creating a Synchro project for Augmented Reality (AR) on mobile devices would be highly desirable. This would enable users to experience visualizations while being outdoors, allowing them to see virtual elements seamlessly integrated into the real...
Yasin Rafiq almost 2 years ago in SYNCHRO 4D Pro / Animations 1