Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1302

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas over 1 year ago in SYNCHRO Control / Models 7 Future consideration

Delete individual slices instead of merging whole element

When using Synchro Modeler, you can create various slices to subdivide an element. It is not possible to delete just one slice, instead you can only merge the element so that all of the slices are deleted. This is a big problem if many slices have...
Ruth Fuller over 1 year ago in SYNCHRO Modeler 2 Needs review

Ability to reference and dynamically update Dropdown/Cascading list connected to a datasource

No description provided
Arpit Prakash 3 months ago in SYNCHRO Control / Forms 0

Ability to upload multiple Inspection Configuration spreadsheets

Currently, we need to maintain a singular spreadsheet to add additional Form Definitions to the same project. This spreadsheet can become very large and hard to manage, and would be easier to have distinct spreadsheets for sets of similar Forms.
Arpit Prakash 6 months ago in SYNCHRO Control / Inspection 0 Unlikely to implement

Issues with moving Regions

It seems the Region sometimes goes to a random location, within another Region if i try to move it around. This mostly happens if I drop it part outside the canvas. Also, doesn't look like i can move a Control below a region, but have to move the ...
Arpit Prakash 6 months ago in SYNCHRO Control / Forms 0

Add some kind of functions to provide evidence for contractor endorsement in reports

Refer to Bentley support case CS0280359 (attached file) or below: Knowing that the design rational for "Reports" module from support, which the report generated and submitted by one party (e.g. contractor) will be reviewed and approved by another ...
Tat Man Leung 2 months ago in Perform / Daily Diary & Reports 0

Ability to reprovision (update) Inspections from a template to production projects

We can only provision Inspections once (initial provision only), but cannot reprovision to get updates from the template project, unlike regular Forms.
Arpit Prakash 5 months ago in SYNCHRO Control / Inspection 0

Make Hierarchy tree and Inspection Group tabs accessible from a single page

The hierarchy tree config works with Inspection Groups and Attribute Forms but is in a separate admin module. They should all be on the same page for a unified workflow experience.
Arpit Prakash 4 months ago in SYNCHRO Control / Inspection 0

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes 5 months ago in Perform / Progress Measurement 0

Ability to export Forms as PDF

No description provided
Arpit Prakash about 1 year ago in Field / Forms | Forms 1 Future Consideration