Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1325

When Adding a new User to SYNCHRO and I put their Full Name in the Name field their Name should actually show up rather than as FirstName LastName.

When Adding a new User to SYNCHRO and I put their Full Name in the Name field their Name should actually show up rather than as FirstName and LastName. If the User want to update their name at a later date this should be an option in their profile...
David Dudek about 1 year ago in SYNCHRO Control / Forms 0

Based on 4D Pro's Task Name when creating a form.

When a user creates a form in 'My work', he wants to create it based on the Task Name of 4D Pro, like Perform. He said that it can be used to input the quantity value for each task in the field.
HoSang Jeon about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Better Connection Between Map and Model Views

I would like for there to be better connections between the Map and Model Views. If the Model is geolocated, it should automatically be connected to the Map View. If I place an issue on said geolocated Model, I should not have to place it separate...
Guest over 3 years ago in SYNCHRO Control / Maps 0 Future consideration

Ability to add custom forms to mobile platform e.g. vehicle prestarts

Utilising custom forms to be able to create prestarts for equipment. Daily prestart checklists varying on type of equipment.
Jake Roduner about 1 year ago in Perform / Plant & Equipment Tracking 1 Already exists

Reflect simultaneous activities with different locations in a 4D animation

In road projects where there are different sections and different construction elements in which there are several tasks occurring at the same time in different locations, I would like to reflect simultaneous tasks with different locations in a 4D...
Sergi Ferrater about 1 year ago in SYNCHRO 4D Pro / Animations 1

Group Option in Form Designer

Many case, in a form user want to have a group of Check Box, where user only allowed to select one. This requirement is easy with the group option that normally available in the programming lagguage.
Indrawan Wijaya about 1 year ago in SYNCHRO Control / Forms 0

ability to escalate to forms via choice in drop down (or script)

provide ability to escalate to different forms via user choice in a drop down type control or through scripts action (which can be triggered by a drop down or other). Example: User raises an Issue form. describes the issue, provides additional inf...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 0 Likely to implement

SYNCHRO 4D Pro/Scheduler/OpenViewer to be certified on Windows 11

No description provided
Shaohua Guan over 3 years ago in SYNCHRO 4D Pro 1 Planned

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash about 2 years ago in SYNCHRO Modeler 0 Needs review

Make all task properties available as columns within the task table.

Have all task properties available as columns within the task table. The user is currently required to run a script to push data to a user field to make visible in the task table. For example budgeted labor units, actual labor units, remaining lab...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration