Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1285

Add more data type to cascading list

Cascading list currently supports only text data type. More data types (number, boolean, dates) should be added so that the cascading list can interact more with Actions.
Shaohua Guan 10 months ago in SYNCHRO Control / Forms 0 Future consideration

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash over 1 year ago in SYNCHRO Modeler 0 Needs review

call script from button on Ribbon

suggest calling any Script with a button on the ribbon bar. Similar to Microsoft Macros.
about 5 years ago in SYNCHRO 4D Pro 2 Future consideration

Update Gallery UI with date organization in grid view of Media Explorer

When using photo storage like Google Photos - the UI for the gallery view is organized quickly by Dates. It also provides a very quick and simple date slider along the side to navigate to older dates. The date organization is a quick easy way to f...
Paul Johnson over 1 year ago in SYNCHRO Control / Media Indexing 0 Future consideration

Import multiple P6 projects from single XML file

I’m importing a P6 XML file into Synchro which contains multiple projects (50ish). It would be helpful if there is a way of selecting more than one project to import simultaneously. Otherwise I have to repeat the same import operation 50 times whi...
Guest over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Allow AssignedUsers to be automated through csv upload

Assigned Users property is essential and critical in managing form visibility when Is Private is set to True. This is necessary in complex subcontractor structures where the parties needs to be isolated from each other and still use the same Form ...
Kiril Tasev 10 months ago in SYNCHRO Control / Forms 0 Future consideration

3D Filters for assigned geometry

The users have lots 3D Objects that unassigned to the tasks. It would be useful if we can have a feature (like 3d filter) that will allow us to display only assigned geometry to the tasks I was trying to use Data Visualization tool, but I found it...
Guest over 1 year ago in SYNCHRO Control / Models 0 Future consideration

Element Properties in Status Update

It would be interesting to have a Properties Window of the Element/s when you select one or more in the Status Update screen. It would help to locate a specific element of the model or know if the selected is the correct one.
Guest over 3 years ago in Field / Status update | Resources 0 Planned

Ability to see both Profile/Cross Section View together

Arpit Prakash over 3 years ago in SYNCHRO Control / Models 1 Future consideration