Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1303

Provide ability to set default location in map for Desktop users - Project Pin

When using the location functionality we have two options: Set location of a form or navigate to my location to see all submitted forms. In any case, when using the Desktop Control client, Map most likely defaults to US. We are in UK. When I click...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0

Primary model in synchro control

There must be an option to make any model in a project in synchro control to be made as primary.
Jerry David Jaypaul almost 2 years ago in SYNCHRO Control / Models 0

QTY this period in Payment applications

You should also be able to enter a quantity and not only the price. You need to calculate the amount before entering it, but if you just enter the quantity of work the amount is automatically calculated.
Asbjørn Jon Ørrild almost 2 years ago in Contracts 0 Planned

provide capability for user selectable date/time binding to have same functionality as DueDate

As a user i would like to have the ability to track more than one date in a form. My need at the moment is where I have a calibration register. Each form is a record for an instrument. The instrument has a calibration expiry (used DueDate) as well...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0

Import multiple P6 projects from single XML file

I’m importing a P6 XML file into Synchro which contains multiple projects (50ish). It would be helpful if there is a way of selecting more than one project to import simultaneously. Otherwise I have to repeat the same import operation 50 times whi...
Guest over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Display Focus Time

Users have told me that they really want SYNCHRO Control to display Focus Time like 4D Pro does.
HoSang Jeon almost 2 years ago in SYNCHRO Control / Models 0

Player buttons for 4D review

Users say SYNCHRO Control really needs player buttons for 4D review, just like 4D Pro.
HoSang Jeon almost 2 years ago in SYNCHRO Control / Models 0

Adding Contingency Transfer to Contracts module in SYNCHRO Control

Users from Lee County find the contingency transfer feature from EADOC really useful to be added to the current SYNCHRO Control - Contracts module
Shaohua Guan 11 months ago in Contracts 0

See source of model and Ability to remove model from iModel viewer

Using the iModel viewer in the browser gives a list of different models. It doesn't show however where these models come from. It would be useful to see that (when hovering or in the properties ...) At the same time it would be useful to have the ...
Johan De Cock 11 months ago in SYNCHRO Control / Models 0 Future consideration

Get overview of "local" connectors from within the cloud environment

I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
Johan De Cock 11 months ago in SYNCHRO Control / Models 0