Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1297

Import multiple P6 projects from single XML file

I’m importing a P6 XML file into Synchro which contains multiple projects (50ish). It would be helpful if there is a way of selecting more than one project to import simultaneously. Otherwise I have to repeat the same import operation 50 times whi...
Guest over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Based on 4D Pro's Task Name when creating a form.

When a user creates a form in 'My work', he wants to create it based on the Task Name of 4D Pro, like Perform. He said that it can be used to input the quantity value for each task in the field.
HoSang Jeon almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Element Properties in Status Update

It would be interesting to have a Properties Window of the Element/s when you select one or more in the Status Update screen. It would help to locate a specific element of the model or know if the selected is the correct one.
Guest over 3 years ago in Field / Status update | Resources 0 Planned

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Ability to see both Profile/Cross Section View together

Arpit Prakash over 3 years ago in SYNCHRO Control / Models 1 Future consideration

allow multiuassign to have custom binder

There are cases which will benefit greatly from having the ability to assign custom bindings to the Multiassign control. E.g. Subcontractors supervisors live on a project. The selection does not need to assign the form to the custom users, just be...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0 Future consideration

enable creating workflow from scratch without importing one

Currently when a new form is created one needs to import a workflow only then to modify. Please, enable creation of workflow statuses from scratch by providing the "Add new status/step" in the "Set workflow" tab
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 1 Will not implement

System notification to selected user (not specifically assigned) to allow automation through API

Scenario: A form reaches a specific stage with some data entered by a user. On clicking a transition button or save or else, the system sends a notification to specified by the designer user/account/e-mail that is not assigned to the form. This me...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash almost 2 years ago in SYNCHRO Modeler 0 Needs review

Open an issue from within a custom form

Would like an option when creating a form to have a dropdown where a certain answer will automatically create a issue that associated with the form
Michael Fletcher 11 months ago in SYNCHRO Control / Forms 1 Planned