PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

SYNCHRO Control

Showing 779

Adding QR to pdf documents

It would be nice to be able to add QR to any PDF documents to control the relevance of document versions.
Andrey Aksenov about 2 years ago in SYNCHRO Control / Documents 1 Already exists

Auto hide select elements tool bar on the top

The Select Elements tool bar should stay minimized if user has chosen to minimize it. It currently will not stay minimized even after user has minimized it, and it always blocks a portion of the model all the time, therefore user needs to constant...
Jacqueline Chen over 4 years ago in SYNCHRO Control / Models 0 Planned

Drop down option to allow more than 25 forms to be viewed per page.

Our current Projects involve approximately 250+ forms of each type to be completed for installed asset inspections. the ability to have a drop down option at the bottom of each page with options to view 25, 50, 100 or 500 forms at any time without...
Paul Keen about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Dashboard Can Filter by Form

Top part in the dashboard (chart and numbers) can be filtered by Form Name or Form Category.
Indrawan Wijaya about 2 years ago in SYNCHRO Control / Reports 0 Future consideration

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon about 2 years ago in SYNCHRO Control / Forms 1 Already exists

Related Form Traceability

My work history has always taught me that the 'Tag' (unique equipment identifier) was king, by that I mean everything raised (form) during the project life cycle always had a relationship to the tag, this way, moving the tag from engineering throu...
Guest over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Details of which Model the Form is assigned to

If I am on a particular model and I click on a Form under Task, it zooms into the location. However, if the Form is assigned to another model that's not active, it doesn't do anything. I have no idea which model that Form could be attached to. Ide...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Webpage Refresh deaults to Map View

When I refresh the webpage, regardless of the model I am working with, the view defaults to the Map view. Before Refresh - After Refresh - It might be better to maintain the same model view that's currently active, considering there could be diffe...
Arpit Prakash over 4 years ago in SYNCHRO Control 0 Future consideration

Model tree level visibility toggle issue

After I hide all the models at the top tree level/ or hide all, I am unable to display individual levels as required. I am not sure if this is by design or a bug, but it's a natural tendency to make visible only the levels that you need and simply...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Focus Time position to center or left instead of right in Schedule view

Focus Time position centered or left instead of at the end of the project/ to the right. Currently Focus Time can hardly be seen as it defaults to the project end and you wouldn’t notice that Focus Time even exists.
Jacqueline Chen over 4 years ago in SYNCHRO Control / Models 0 Will not implement