Currently, the system binding Assigned to is able to be used to populate user lists using scrips, but not the other way around. By allowing the user lists to populate this system binding we can automate workflows and reduce the manual work for use...
Kiril Tasev
almost 2 years ago
in SYNCHRO Control / Forms
0
Future consideration
Currently, system bindings only include Assigned to and Assigned users. To simplify script configurations and allow for more automated workflows, there is a need to include more. Created by - This would allow a script or a workflow transition to s...
Kiril Tasev
almost 2 years ago
in SYNCHRO Control / Forms
0
Future consideration
Calendar view of all due dates in "My Work" is great but a similar view for individual form types would be beneficial for users that need to triage work for specific forms types.
Ryan Posnikoff
almost 2 years ago
in SYNCHRO Control / Forms
1
Future consideration
Preconstruction Forms should be in the list of Forms, but under a group/heading called Preconstruction that can be minimized. This will prevent having a long list of Forms to look through.
Derryl Acosta
almost 4 years ago
in SYNCHRO Control / Forms
0
Future consideration
A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
To have an Automatcing role like we have in 4D Pro should help. With Automatching role, we do not need to build so many Queries if we have long Cost Code list. Or if Modeler can have an Autoassigment logic is again better.
Indrawan Gmail
almost 3 years ago
in SYNCHRO Modeler
0
Needs review
Modeler need to have a search button that can search from any property. User just need to put value that he want to find.... Modeler will search from All Properties. There is flesibility where user also can put the property name if user want to fi...
Indrawan Gmail
almost 3 years ago
in SYNCHRO Modeler
0
Needs review
at completion calculation is depending on the duration and expected finish not the inputs of actual and remaining units as per primavera So we have the following: There is no input place for the at completion units on synchro like primavera P6 The...