Show last modified date on form reports and dashboard
There is a need to see last modified date in grid views, both on form-specific reports as well as on the dashboard page. This will allow the team to understand recent workflow updates and what workflows are falling behind.
Uploading a ProjectWise Document Set into Control via Connections
When creating the federated model, I would like to be able to choose the Document Set containing all the 3D models which I created in ProjectWise. The Document Sets doesn't come through when I connect Control to ProjectWise via Connections.
We have to be able to move the QR Code after it is placed. Right now, the entire sheet has to be deleted and reimported back in to change the location of a QR code by placing a completely new one.
Paul Johnson
almost 2 years ago
in SYNCHRO Control
1
Will not implement
Users are collecting images of their sites compiled from drone footage on a regular basis. Users would like a way for project managers to upload these images and make them available as overlays on the map.
Paul Johnson
almost 2 years ago
in SYNCHRO Control / Maps
0
Future consideration
Display Form's Creation Date and Closure Date in the form summary page
Users are currently relying on the audit trail to know when the form was created and approved/closed. Unfortunately, these details cannot be print out in the report. Having this function will help user to easily identify when the form was created ...
Siti Nurhazirah Mokmin
almost 4 years ago
in SYNCHRO Control / Forms
0
Future consideration
Provide a new date control that can be shown in the calendar
There are use cases where it is advantageous to be able to see a form instance on the calendar in "My View" area. Currently only the use of DueDate system binding will show a form on the calendar. There is a limitation that DueDate cannot be assig...
Kiril Tasev
almost 2 years ago
in SYNCHRO Control / Forms
1
Future consideration
Ability to show different day types from calendar in timeline in Synchro 4D Pro
If I add a new calendar day type with colour green, I should be able to see it in the timeline as well. Currently the timeline only shows working time non working days, and non working times of day. See screenshot, where 14.-17. of March 2023 is m...
In order to make import of 3D equipments and some basic geometry possible in synchro control project, why don't we add a equipment library by default to documents tab. This will enable user to add required equipment files to itwin bridge seamlessl...