Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1287

export multiple escalated forms in one PDF

if form A is escalated to form B, each form need to be exported separately. have the option to export both forms in one PDF document if one form is escalated to another.
Siti Nurhazirah Mokmin almost 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Two point scale and rotate PDF that are not geolocated

Need a way to locate two known objects on the PDF and then the same spots on the map to move and rotate onto the pdf the map.
Dan Sheldon almost 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski 9 months ago in SYNCHRO Modeler 0 Needs review

Mandatory Fields on Events: Event Date and Event Category

Improve the data integrity of Events by making Event Date and Event Category mandatory on the creation of the Event.
Luke Read over 2 years ago in Perform / Events & Notices 2 Future Consideration

At completion calculations

at completion calculation is depending on the duration and expected finish not the inputs of actual and remaining units as per primavera So we have the following: There is no input place for the at completion units on synchro like primavera P6 The...
Rana Hosney over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Test to see if notification is sent

No description provided
Kevin Vivien 9 months ago in SYNCHRO Control / Inspection 0

Admin transitions

When form is used by users, sometimes there are batch of them that need to be deleted/archived/changed to a specific status. In cases where form is deleted, that leaves a gap in the numbering system and questions further down the line, so it is be...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Synchro Control auto-emails to a daily or weekly digest

A way to set the Synchro Control auto-emails to a daily or weekly digest, instead of one email every time something happens.
Thomas Schimpf about 3 years ago in SYNCHRO Control / Reports 0 Future consideration

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski 9 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7