PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1303

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Custom PDF Design - Paper size

Hi, We have user that need the PDF export in landscape orientation. Right now the PDF export always give Portrait format. Please add the setting to get the Landscape format. and also it is good if we can set the PDF size, like A4, A3, A1 etc. Rega...
Indrawan Wijaya 10 months ago in SYNCHRO Control / Forms 0

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Ability to map field to more than one PDF location

Control only allows each field to map to one spot on a PDF. There are many fields were the information needs to be mapped to different locations on the PDF - like when each pdf page has data in the header. The Forms service has no limitation.... i...
Guest over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Versions of 3D models in iModel

This idea refers to using Synchro Control with an iModel with Projectwise Connections. When viewing the Connections I think it is essential to be able to see the version of the model, e.g. P03 or C06. The model version isn't listed on the Connecti...
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0

Allow filtering of roles for Assigned to in transition

When using transition we can use property Assigned To . Unfortunately at the moment Form designer only allows to choose one role. Please, allow multi selection of roles available for the Assigned To binding when used in transition.
Kiril Tasev 10 months ago in SYNCHRO Control / Forms 0

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. over 1 year ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Synchro Control auto-emails to a daily or weekly digest

A way to set the Synchro Control auto-emails to a daily or weekly digest, instead of one email every time something happens.
Thomas Schimpf about 3 years ago in SYNCHRO Control / Reports 0 Future consideration

To use thousand separators when numbers are displayed in the form

When using the number box in the form, there is no thousand separator in the number displayed. This makes it hard to see the value, especially for large amount like hundred thousands and millions. However, if use text box, this doesn't allow the m...
Siti Nurhazirah Mokmin almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration