Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1041 of 1041

Multiple 3D window option for comparing planned versus actual progress

Being able to compare the baseline or planned schedule versus the actual schedule by having the possibility to open more 3D windows.
Brigt Rykkje over 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned

Pasted Form Control with an associated binding

if a Control has a binding, when it's copied/pasted, can we add an option where the bindings are not copied/pasted as well? meaning the pasted Control does not have a binding.
Shaohua Guan over 1 year ago in SYNCHRO Control / Forms 0

Auto Link PW Plans To Inspections

The ability to automatically link documents in PW to a designated form when users create new inspections. I.e. have the ITP managed in PW and autolinked to the inspection
Guest about 4 years ago in SYNCHRO Control / Inspection 0 Future consideration

multiple transitions to same closed state with different outcome of inspection

Case scenario: Transition from State A(open) to Closed by Client inspector named "Passed" based on Approve credentials Transition from State A(open) to Closed by Subcontractor named "Non attendance" based on Create credentials
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Flow BreakSwitch - contact authorised role or admin to move flow when blocked by someone or something

Provide option to notify authorised role or admin that a flow is blocked by person or rule and needs intervention or progression. Case scenario: Flow goes from subcontractor to Client for Inspection. If Client decides they may not carry the Inspec...
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Send a document to PDFTron for conversion to PDF via a Web Service REST API

As a Bentley developer I want to be able to send a document to PDFTron (Apryse) via a Web Services API call for conversion into a PDF document. Expectation is that a PDF document is generated and available via an endpoint returned by the original ...
Paul Houghton over 1 year ago in SYNCHRO Control / APIs 0

change layout in Control home page.

Users want to change the layout. They have uploaded a lot of imodels, but they want to see at a glance what files are in total. Currently imodel's window size is too small.
HoSang Jeon about 4 years ago in SYNCHRO Control / Models 0 Future consideration

Change duration display from hours to days

Can I change duration display from hours to days?
HoSang Jeon about 4 years ago in [Archive] SYNCHRO 4D Review 2

Loaded and unloaded objects in Pro .sp should preserve the same load status in 4D Review after it's uploaded

Currently unloaded objects in Pro, once SP is uploaded to 4d review, will show as loaded therefore displaying and visible. User will need to manually select these objects every time to hide those objects when opening the 4d review session. If user...
Jacqueline Chen over 5 years ago in [Archive] SYNCHRO 4D Review 0 Will not implement

Enable trigger in transition to start Section Collapsed or Open

Simple trigger/tickbox in the status of the flow that allows a Section to be displayed collapsed or open depending on the state/transition. State 1 - collapsed State 2 - open State 3 - collapsed
Kiril Tasev almost 3 years ago in SYNCHRO Control 1 Already exists