Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1323

Email Notifications when Documents uploaded to the Documents Module

When Documents are uploaded to the Documents Module, it would be nice to have the option to receive email notifications when new documents or any documents are uploaded to this module.
Derryl Acosta over 3 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 2 Planned

PDF Export – for photo drop Component not take spaces when there is no photos taken

On the PDF Design to export to PDF report – for photo drop Component not take spaces when there is no photos taken. Please see attachement.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung 11 months ago in Perform / Program/Schedule Collaboration 0

Add Legend to Synchro Control Schedule-enabled saved views

Add a legend similar to 4D Pro that shows the appearance profiles in schedule-enabled iModel saved views.
Sarah Ruckhaus 11 months ago in SYNCHRO Control 0

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Animations 0

Allow save of a form with incomplete data in mandatory fields in a status

When form bindings are set as required in "status" window the published form will not allow intermediate save until ALL properties have values. Allow for incomplete data to be saved by user. From user perspective I have contributed time to populat...
Kiril Tasev 11 months ago in SYNCHRO Control 0

Export to Synchro 4D plugin for Autodesk Civil 3D

Looking for Direct Synchro 4D plugin for Civil3D.
ASHWIN RAJESH K almost 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Export to Excel all filled out forms along with captured information like 3d objects and tasks

Currently you can export all the filled out forms to excel, but without the captured 3D object/resources (via Control->Dashboard->Export view to Excel). It will be usefull to export more information about issue, including captured 3d objects...
Igor Saenko over 3 years ago in SYNCHRO Control / Forms 0 Future consideration