Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1323

State and Status should match

In the workflow for a Form Definition, if a Form Definition State is Closed, it should also match the Status. In the Audit trail, it does not tell me as a User if a Form Definition is really Closed as Approved, Reject, or Void. It would just be in...
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Bold text customization in SYNCHRO Inspections Forms

It would be beneficial on projects for the enablement of customized bolding of text in certain area in inspection forms. this allows for the end-user to ensure he doesn't miss important information. See attached .jpg for the current project im wor...
Doug Theret over 4 years ago in SYNCHRO Control / Inspection 1 Already exists

Email Notifications when Documents uploaded to the Documents Module

When Documents are uploaded to the Documents Module, it would be nice to have the option to receive email notifications when new documents or any documents are uploaded to this module.
Derryl Acosta over 3 years ago in SYNCHRO Control / Documents 0 Future consideration

PDF Export – for photo drop Component not take spaces when there is no photos taken

On the PDF Design to export to PDF report – for photo drop Component not take spaces when there is no photos taken. Please see attachement.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 2 Planned

Export to Synchro 4D plugin for Autodesk Civil 3D

Looking for Direct Synchro 4D plugin for Civil3D.
ASHWIN RAJESH K almost 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Change Multi Form Status at one time

Change Multi Form Status at one time
Indrawan Wijaya 11 months ago in SYNCHRO Control / Forms 0

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Animations 0

Ability to Define Condition on Property Assignments during Transitions

I want to be able to define a condition for property assignments - One use case scenario is to automatically assign the Form to a User, based on a Project that was selected in the previous status.
Arpit Prakash almost 2 years ago in SYNCHRO Control 0 Planned