Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1336

Two point scale and rotate PDF that are not geolocated

Need a way to locate two known objects on the PDF and then the same spots on the map to move and rotate onto the pdf the map.
Dan Sheldon over 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Ability to have subproject

We need the ability to have multiple projects under one main project. I this example, see attached image. I have one main job number. And in this case 350 different airports or sub projects. Each project has the same folder structure in it. Right ...
Martin Price over 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova over 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Provide ability to clear permissions in Form designer

Provide ability (button) to clear all permissions from a form template in Form designer "Set permissions" tab. This will allow quick clean slate reprovision of roles and permissions.
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Planned

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest over 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Work hours automatically populate when a rate code is inputted

When a worker is sick or on annual leave their hours differ depending on their contract, we would like to be able to input a rate code for a worker and the hours automatically populate based on a predetermined settings linked to their profile or role
Philip O'Donoghue 11 months ago in EVM (Perform) / Administration 0 Will not implement

Be able to add GeoTIFF or place images as textured plane on coordinates

Being able to do this would improve the current workflow (manual placement of textured plane on a 2D raster that is imported as 3D) Improvement in Quality (exact placement) Improvement in efficiency (no manual placement)
Bram Wildekamp over 3 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

Guest signature/approval/audit trail mark

It will be useful to have an ability for a form to be sent to external to the flow/project person as a guest/3rd party signatory. This is to enable that person to assure "yes/no" or "Accept/Reject" statement that can then be added to the form's au...
Kiril Tasev almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Allow Date check for past event

In many occasions we use date for something that is yet to happen. Yet the user can input a date in the past. Having the ability to restrict the date for future events as related to the date of input of information would avoid this kind of errors.
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

3D View Focus Time Date - Display First Day of Week

This is useful because we would like to be able to show the week commencing date in the 3D view focus time. Currently we set the project focus time to the end of each week (Sunday) in order to capture all the activities happening, however this mea...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration