Schedule Viewer being able to hide all object except those during focus time.
being able to hide all objects in schedule model viewer with exception to those within the focus time would be of significant value to users across the project.
Please, consider introduction of one off start trigger one off start trigger at initiation of the form. The canvas change control does not work as the canvas is reloaded each time a transition occurs.
When user use form for check list. User want to save the check list history. So user can see what is failed on first check list. with the comment and Photo. This is reqested by RWS singapore, and nPulse has this feature.
Indrawan Wijaya
over 1 year ago
in SYNCHRO Control / Forms
0
Future consideration
Need the ability to select an object or multiple objects through the Model tree. A few quick suggestions, but can be developed upon - > Shift select to select a range and Ctl Select to add/remove from a selection > Select all the child eleme...
My Project Community Within SYNCHRO Field, having the ability to see who is online; using the Field App within the Project Boundary would give me the advantage of assigning the closest, therefore most efficient response possible. For example, rais...
I would like to apply different styles to control when needed, instead of building specific styles for each case. For example, I have a style for bold text and a separate style for underlined text that could be combined when needed. It would be ni...
Specifically wanted for checklists. It feels more natural to have the checkboxes align with a label on the right side. I could see use cases for other things like entering numbers for quantity or labeling dimensions.
Sometimes I want to experiment with a form layout without worrying about clicking undo in case I don't like the changes. It would be nice to turn off the auto save or be able to revert to the state when I first opened the form.
Since we cannot delete forms, it would be useful to hide forms with a 'Void' status from the work table if they were submitted in error or no longer relevant. It would also be useful if those records aren't included in exported csv files.
Contractors/.CMs want to be able to link emails within their construction doc management and controls systems. This could include simple drag and drop of emails in Outlook into Bentley Project Management system to be managed as discrete doc or att...