PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1331

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo over 1 year ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Display the location of the user on the model

Enable GPS location of user on the model (the "blue dot"), based on the device location service, to allow a user to better orient themselves while on the construction site. UPD.: "As a field engineer, I want the mobile app to display my current lo...
Luke Read 5 months ago in Field / Models | Display 0 Future Consideration

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest about 4 years ago in SYNCHRO Control / Admin 0 Future consideration

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 2 years ago in SYNCHRO Control / Models 7 Future consideration

Include a Synchro Evacuation Process

This would assist the personnel, specifically the HSSE team on site when there is an evacuation emergency to manage the entire process. Synchro can add features below that can be used during an emergency evacuation: Supervisors seeing the names of...
Kaluba Josephine Changwe 3 months ago in Perform / SYNCHRO Perform Mobile 1 Future Consideration

Ability to embed Power BI publish to web(public) url

The current embedded solution requires authentication to view the report and makes it restricted to the creator's organization. External users cannot access this.
Arpit Prakash about 2 months ago in SYNCHRO Control / Reports 0

Delete individual slices instead of merging whole element

When using Synchro Modeler, you can create various slices to subdivide an element. It is not possible to delete just one slice, instead you can only merge the element so that all of the slices are deleted. This is a big problem if many slices have...
Ruth Fuller about 2 years ago in SYNCHRO Modeler 2 Needs review

Ability to maintain folder mapping for PDF export through Forms Workflow

If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Arpit Prakash 9 months ago in SYNCHRO Control 0

Ability Sort Schedule by Column Date or other

For some reason when I upload my Synchro 4d project to Synchro Control the schedule does not sort by Date or by ID for some reason, so the tasks look like they are all over the place and not in order.
David McLaughlin about 2 months ago in SYNCHRO Control / Schedule 0