PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 105

Data Center in European Union Region

The European Union has its own laws related to data protection. At time of writing Synchro Control does not provide any data center where European Law aplied to.
Guest over 2 years ago in SYNCHRO Control / Admin 0 Planned

Ability to see Saved Searches when creating an iModel Connection from PW

This should be in sync with what we see through PW connection in documents.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Allow GCS Reprojection

I often have models or drawings that are not created in the same (/correct) local coordinate system. In Microstation application it is possible to assign GCS to those different files and then reference them with "GCS reprojection". Meaning that th...
Johan De Cock 8 months ago in SYNCHRO Control / Models 0 Planned

We are going to begin working with the Dashboard in SYNCHRO more and i came across some issues that would be an annoyance to our customers.

We are going to begin working with the Dashboard in SYNCHRO more and i came across some issues that would be an annoyance to our customers. Please see the attached document.
David Dudek 8 months ago in SYNCHRO Control 1 Planned

Default schedule focus time position in Schedule tab

Suggestion: When Schedule module is opened, focus time should be set to "Today". Also, the month filter should open to the current month rather than the beginning or end of the project.
Thomas Whiteley over 3 years ago in [Archive] SYNCHRO 4D Review 1 Planned

Assign Resource Group to Task - New button

It is nive to have this new button. Assign Resource Group to Task. Please see image on the attachment.
Indrawan Gmail about 2 years ago in SYNCHRO 4D Pro 0 Planned

Copying Inspection Form from a Template Project

When Re-provisioning from a Project Template, it does not Copy over Published Inspection Forms. 2. When creating a New Project and using a Template with Inspections, it does not copy Inspection Forms that are Published.
Derryl Acosta over 1 year ago in SYNCHRO Control / Inspection 0 Planned

Open an issue from within a custom form

Would like an option when creating a form to have a dropdown where a certain answer will automatically create a issue that associated with the form
Michael Fletcher 9 months ago in SYNCHRO Control / Forms 1 Planned

Allow drafting forms in designer in bulk

Please, consider option to select all forms (available) and draft them at once (Not available). This is a useful time saving feature where a form needs to be re-provisioned into another project or form definition pulled through API and many other ...
Kiril Tasev 10 months ago in SYNCHRO Control / Forms 1 Planned

Able to Set Form Status for Multi Form Selected (SYNCHRO Form Manager)

Can set Form Status for Multi form Selected (in Form Manager) Current we must set the Form Status one bye one. Example: Set All Form Design to Draft. or Publish multi form in one click. Thank you.