ability to escalate to forms via choice in drop down (or script)
provide ability to escalate to different forms via user choice in a drop down type control or through scripts action (which can be triggered by a drop down or other). Example: User raises an Issue form. describes the issue, provides additional inf...
Once Received RFQ response from Suppliers, the Cost Variant data should compare and generate the Cost Comparision Report. This report is useful to conform the correct suppliers and also selected suppliers profiles for QTY, Cost, all etc.
3D Notations (Footnote / Comment) - Modifying the input (based on property)
We are looking for a solution for creating a footnote / comment automatically based on a property. Normally, the function footnote / comment will give area, length or coordinates automatically but I want the footnote / comment to grab the Typemark...
Currently QR Codes have a 255 char limitation. Alstom have requested/highlighted the need to have an increase in data stored within - Upto 16 columns within the QR Code.
Many times, we want to clear the Modeler Local Cache. And I think it is better to have the button to click, rather than need to go a folder location and delete it manually. This Clear Cache button should able to clear only selected iModel (not alw...
Indrawan Wijaya
about 1 year ago
in SYNCHRO Modeler
0
Needs review
To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.
For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.
As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control / Models
1
Future consideration