Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1304

View Control on multiple Monitors to improve workflows and clarity

Similar to how designers and split their desktop products onto multiple monitors, can we have this same functionality within Bentley web-based products. An example would be, I would prefer to see the Schedule Gantt Chart and details in one window,...
Corey Johnson over 2 years ago in SYNCHRO Control / Documents / Forms / Maps / Models 1 Future consideration

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 3 years ago in SYNCHRO Control / Inspection 0 Planned

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Could additional snap modes be added in Field model tools

Could you add Intersection, Center, and Midpoint Snaps to SYNCHRO Field model viewing?
Dan Sheldon almost 2 years ago in Field / Models | Tools 3 Future Consideration

Keep colors assigned in validation feature for query assignment of cost codes.

Need to have the capability to assign colors to cost codes assignments in Quantity Takeoff view and toggle back and forth from red/green/gray view. It is difficult to determine if query selected elements are listed in the correct property provided...
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Needs review

Default QR Code Location

Have the capability to setup the default location for the QR code stamp in plan set module. Also have the capability to stamp all Plan sets at one time or selected range, draft or published status, etc.
David Gallaher almost 2 years ago in SYNCHRO Control / Plan Sets 2 Future consideration

Add more details to delete attachment dialog

To prevent users from accidentally deleting the wrong attachments, it would be good to add more details to the delete dialog that pops up. Currently, it just asks the users whether they want to delete the attachment, without an indication to show ...
Arnar Agustsson almost 2 years ago in SYNCHRO Control 1 Future consideration