Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1304

Expand on visibility assignments for roles and users

Quite often (almost every multi contractor form) requires visibility to be restricted to Client and anyone in the Creator's organisation. We currently manage this by asking the user to assign a role set up for their company to the AssignedUsers pr...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Add User field Drop down list feature

Further to our Customer suggestion, it would be very usful to have a Drop down list feature for User defined Field. It could be the list with the values to be selected from the same formula in the field value, or (to save ASCII script text) is ref...
Pavel Khrapkin over 2 years ago in SYNCHRO 4D Pro 0

Project filtering by filters or activity codes

the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Joost Wijnen over 3 years ago in Field / Models | Display 0 Future Consideration

Templated Cost Analytics

Hi Team, it is feedback from number of users who wants to see if we can have 2 things added in cost analytics. 1. Saving our own template 2. Downloading the data gathered using various fields in Cost Analytics
Siddharth Sahare over 2 years ago in Perform / Analytics/Dashboards 1 Future Consideration

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 3 years ago in SYNCHRO Control / Inspection 0 Planned

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Selecting Task columns to be always visible

Selecting columns to be always visisble in the task list. For instance the ID and Name column to be always visible when scrolling to the right to other columns. This function is available in Excel
Stephan Klotz about 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Will not implement

View Control on multiple Monitors to improve workflows and clarity

Similar to how designers and split their desktop products onto multiple monitors, can we have this same functionality within Bentley web-based products. An example would be, I would prefer to see the Schedule Gantt Chart and details in one window,...
Corey Johnson over 2 years ago in SYNCHRO Control / Documents / Forms / Maps / Models 1 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration