provide capability for user selectable date/time binding to have same functionality as DueDate
As a user i would like to have the ability to track more than one date in a form. My need at the moment is where I have a calibration register. Each form is a record for an instrument. The instrument has a calibration expiry (used DueDate) as well...
See source of model and Ability to remove model from iModel viewer
Using the iModel viewer in the browser gives a list of different models. It doesn't show however where these models come from. It would be useful to see that (when hovering or in the properties ...) At the same time it would be useful to have the ...
Get overview of "local" connectors from within the cloud environment
I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
I often have models or drawings that are not created in the same (/correct) local coordinate system. In Microstation application it is possible to assign GCS to those different files and then reference them with "GCS reprojection". Meaning that th...
A notification panel on the Home screen for admin messages
It would be great to have an area where the project admin can post messages to the project team regarding upcoming maintenance outages, training sessions or other ideas. Also would be a good place to put the contact info for the person currently a...
multiple transitions to same closed state with different outcome of inspection
Case scenario: Transition from State A(open) to Closed by Client inspector named "Passed" based on Approve credentials Transition from State A(open) to Closed by Subcontractor named "Non attendance" based on Create credentials
Flow BreakSwitch - contact authorised role or admin to move flow when blocked by someone or something
Provide option to notify authorised role or admin that a flow is blocked by person or rule and needs intervention or progression. Case scenario: Flow goes from subcontractor to Client for Inspection. If Client decides they may not carry the Inspec...