PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1310

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Ability to flag daily or weekly Templated Report(s) as "Favourites"

If you have a long list of Templated Reports on a project, with not all of them being applicable to a user, it would be good for a user to flag their "Favourite" reports and have them appear at the top of the list
Luke Read almost 3 years ago in Perform / Reports 0 Future Consideration

Functionality for User Fields when using iModel connectors

When a 3D model is imported directly into a Synchro Control project within the Synchro 4D Pro application (using File > Import), it is possible to create user fields. For example, I could import a 3D model and then I could set up a User Field c...
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0

Work Area Tool Start Location should have option to use project stationing

Right now the tool always starts at zero, however, this may not be the desired project stationing. Eg. Start Station property is 499+99.1 in the following Alignment - It would be ideal to give users the choice.
Arpit Prakash over 1 year ago in SYNCHRO Modeler 0 Needs review

Undo Button or Action in SYNCHRO Modeler

Need an undo button to remove previous actions similar to ORD. This will also help prevent starting over after hiding elements.
Dee User List Acosta over 2 years ago in SYNCHRO Modeler 0 Needs review

Implementing IFC 4X

Is IFC4X implementation and synchronization on the roadmap for the Synchro suite? Unfortunately I am not able to work with IFC 4X2 with the latest Synchro 4D Pro version: ================================================== Error: The schema [IFC4X...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Import/Export 1 Future consideration

Ability to jump between 2D Sheets and 3D Model Views seamlessly

Currently, we can switch from 2D sheets to the previously opened 3D View in SYNCHRO Control, using the following back button - Need something similar for Field as well.
Arpit Prakash almost 2 years ago in Field / Models 1 Future Consideration

Audit Trail in Modeler

When errors are made in cost code assignments it is cumbersome to go back a review the entire model. Having an audit trail feature will pinpoint all actions made, when they were made and by whom to expedite remedying issues. It also will assist in...
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Future consideration