Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1303

Add basic ability to markup uploaded images/photos

It would be useful to be able to: Take image with your mobile have ability to add notes, text have ability to add simple markup e.g. line, circle, rectangle been able to choose the colour of the shapes, font Case scenario: Reinforcement cage is de...
Kiril Tasev about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

ISO 19650 Compliance

It appears that your are not able to use ISO 19650 compliant numbering and that your numbering style still following a very basic 30 year out style of numbering. Please re-code and rectify this asap.
Keith Anthon about 2 years ago in SYNCHRO Control / Forms / Plan Sets 0 Future consideration

Functionality for User Fields when using iModel connectors

When a 3D model is imported directly into a Synchro Control project within the Synchro 4D Pro application (using File > Import), it is possible to create user fields. For example, I could import a 3D model and then I could set up a User Field c...
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0

Add option to transfer comments and photos from one activity to another.

Often photos and comments are uploaded to the wrong activity number. This results in a lengthy process to download the photos and re-enter the comments to the correct activity. Additionally, the person reviewing the entries is often not the same p...
Jackson Morley over 2 years ago in Perform / Site Records 0 Future Consideration

Work Area Tool Start Location should have option to use project stationing

Right now the tool always starts at zero, however, this may not be the desired project stationing. Eg. Start Station property is 499+99.1 in the following Alignment - It would be ideal to give users the choice.
Arpit Prakash over 1 year ago in SYNCHRO Modeler 0 Needs review

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung 6 months ago in Perform / Program/Schedule Collaboration 0

Archive of information from SYNCHRO Control

To create an Archive/Backup of the data in Control for a client
Derryl Acosta about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Add Legend to Synchro Control Schedule-enabled saved views

Add a legend similar to 4D Pro that shows the appearance profiles in schedule-enabled iModel saved views.
Sarah Ruckhaus 6 months ago in SYNCHRO Control 0

Allow save of a form with incomplete data in mandatory fields in a status

When form bindings are set as required in "status" window the published form will not allow intermediate save until ALL properties have values. Allow for incomplete data to be saved by user. From user perspective I have contributed time to populat...
Kiril Tasev 6 months ago in SYNCHRO Control 0

more task filters options

Currently you can filter with a time frame and the 3d view will adapt to it. user should be able to filter by human resource, material resource, equipment resource, and location resource. user should also be able to filter by work package descipli...
Shaohua Guan about 4 years ago in SYNCHRO Control / Models 0 Future consideration